Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequa consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequa

Just to list a few...

CLIENT PROJECT WORK DESCRIPTION DURATION
Nigerian Petroleum Development Company FPSO Mystras Life Extension Rehabilitation and Upgrade in OML 119 Project (Package 25) Rehabilitation of FPSO Mystras Topside & Engine Room Static and Rotating Equipment in OML 119 (Package 25) Apr 2022- Ongoing
Nigerian Petroleum Development Company FPSO Mystras Life Extension Rehabilitation and Upgrade in OML 119 Project (Package 26) Upgrade of FPSO Mystras DCS, Instrumentation and E&I System OML 119 Project (Package 26) Apr 2022- Ongoing
Nigerian Petroleum Development Company OML 116 Operation and Maintenance Manpower Service Contract Provision of Manpower Supply and Adhoc Services for the OML116 Operation and Maintenance Project Jan 2020 - Ongoing
Nigerian Petroleum Development Company OML 119 Okpoho-Okono 12" And 6" Subsea Flexible Pipelines Project Provision of Project Management Consultancy (PMC) for the DED and Construction of the OML 119 Okpoho-Okono 12" And 6" Subsea Flexible Pipelines Project Aug 2019 - Ongoing
Gas and Power Investement Company (GPIC) 1350 MW Kano Independent Power Plant Feasibility Studies Project Provision of Feasibility Studies for the 1350 MW Kano Independent Power Plant Project Feb 2019 - 2020
Nigerian Petroleum Development Company OML 111 Feasibility Studies and FEED for Oredo Flowstation Provision of Feasibility Studies and FEED for Oredo Flowstation and Associated Facilities June 2018 – Dec 2018
Nigerian Petroleum Development Company OML 119 Mystras O & M Service Contract Provision of Operation and Maintenance of the FPSO Mystras Sept 2017– Mar 2022
Nigerian Petroleum Development Company OML 20- Egbema West DED For 3km NAG Flowline Project Provision of DED for the Consruction of Egbema West 3km AG Flowline Sept 2017-Mar 2017
Nigerian Petroleum Development Company NPDC OML 119 for Okpoho- Okono 16” Flexible Pipeline Feasiblity Study Feasibility Study for Use of Flexible Pipe for Subsea 16" Pipeline Repalcement Sept 2016 - Oct 2016
Nigerian Petroleum Development Company Conceptual Studies for OML 26,30, 40, 42 Produced Water Management Treatment of produced water for OML’s 26, 30, 34, 40 and 42 Dec 2014-June 2015
Seplat Petroleum Development Company Ltd Oben Associated Gas Compression Station Project Mechanical, Electrical, Instrumentation Installation and Commissioning of 30mmscd Oben AG Compressor Station with Three (3) Reciprocating Compressors Sep 2014-Dec 2015
Seplat Petroleum Development Company Ltd Seplat As Bulit Survey and Documentation Project As-Built Survey and 3D-Laser Scanning of Oen FS,Amukpe FS and Amukpe Manifold Feb 2014- June 2014
Nigerian Petroleum Development Company Conceptual Studies & FEED for EPIC of Crude Oil Buffer Storage Tank’s at OML’s 26, 30, 34, and 42 Define the requirements for the installation of "Crude Oil Buffer Storage Tank System " for OML’s 26, 30, 34, 40 & 42 Apr 2013 – Nov 2013
NETCO-TECHNIP NNPC Refinaries Upgrading Project Site Survey for Upgrading of Port Harcourt, Warri and Kaduna Refinaries Jan 2013 – Jul 2013
Seplat Petroleum Development Company Ltd FEED for SEPLAT Liquid Treatment Facility (LTF) Crude and Waster Separation Plant and 85,000 bfd Produced Water Plant Feb 2012- Oct 2012
Warri Refining & Petrochemica Company Ltd Power Plant Audit Replacement of Turbine Drivers with Variable Speed Electric Motors Technical Audit Replacement of Turbine Drivers with Variable Speed Electric Motors Nov 2010-Oct 2011
Nigerian Petroleum Development Company FEED for Modularize Oil & Gas Processing Facilities at ABURA FEED package of ABURA Flowstation and Gas Compression Plant: 15,000 BFD of Crude and 15 mmscfd AG June 2010-Oct 2010
Nigerian Petroleum Development Company NPDC OML 119 Gas Monetization Conceptual Study Feasiblity Study for the eleimnation of Flaring of 50-60 mmscfd of gas from the Mystras FPSO May 2009-Sept 2009